Note the final acceptance of the clean room
2016-09-05 16:12:25
Clean room - clean the plant and the final acceptance, in each segment stand-alone test, no load production system self-test after passing the test. Completion and acceptance of the contents of the stand-alone test is to verify that each segment of the project and no production load test systems, clean room (area) performance parameter testing and commissioning divisions perception of quality checks, as required for functional testing and debugging.
(1) clean room when the final acceptance, final acceptance should carefully check the information, documents and records generally include the following:
1 drawings reviewing records, design change notice and as-built drawings;
The main apparatus 2 divisions engineering, materials and instruments of pre-qualified and proven approach inspection reports;
Stand-alone device 3 divisions engineering, installation and inspection records;
4 divisions single test run record;
5 divisions engineering, commissioning and commissioning of the system no-load record;
6 various types of pipeline testing, inspection records;
Test and debug logging safety engineering seven divisions;
8 quality inspection records of each segment of the project.
(2) clean room final acceptance testing of the main contents are as follows:
1 visual stream;
2 wind speed and air volume testing;
3 air filter leak detection;
4 clean room (area) tightness test;
5 room static pressure difference between the test;
6 air cleanliness level;
7 self-purification time;
8 temperature, relative humidity;
9 illuminance values;
10 noise level;
11 additional construction needed by the test items.
(3) final acceptance, after verification and approval, as required for functional acceptance, functional acceptance clean the plant in a "static" test, the main test as follows:
1 detects air cleanliness level;
2 production process have requirements, should be carried out cleanliness tests microbiological tests or chemical contaminants or special test surface;
3 clean room (area) of temperature, relative humidity stability testing;
4 detects the self-cleaning time;
5 detects the clean room (area) tightness test;
6 Determination of illumination;
7 measured noise level;
8 needed to confirm and record airflow patterns and the number of ventilators;
Other test items required for the other 9.
(4) the use of clean plant after acceptance, use and inspection reports should be prepared, and its main contents are:
1 clean room facilities of all kinds (including production technology and equipment) and other open state description;
Description Cleanroom 2 test (region) and their activities; and
3 sub-test record and analyze the comments (including test position, coordinates, etc.);
4 test equipment valid calibration certificate;
5 Acceptance issued by the relevant conclusions.
(1) clean room when the final acceptance, final acceptance should carefully check the information, documents and records generally include the following:
1 drawings reviewing records, design change notice and as-built drawings;
The main apparatus 2 divisions engineering, materials and instruments of pre-qualified and proven approach inspection reports;
Stand-alone device 3 divisions engineering, installation and inspection records;
4 divisions single test run record;
5 divisions engineering, commissioning and commissioning of the system no-load record;
6 various types of pipeline testing, inspection records;
Test and debug logging safety engineering seven divisions;
8 quality inspection records of each segment of the project.
(2) clean room final acceptance testing of the main contents are as follows:
1 visual stream;
2 wind speed and air volume testing;
3 air filter leak detection;
4 clean room (area) tightness test;
5 room static pressure difference between the test;
6 air cleanliness level;
7 self-purification time;
8 temperature, relative humidity;
9 illuminance values;
10 noise level;
11 additional construction needed by the test items.
(3) final acceptance, after verification and approval, as required for functional acceptance, functional acceptance clean the plant in a "static" test, the main test as follows:
1 detects air cleanliness level;
2 production process have requirements, should be carried out cleanliness tests microbiological tests or chemical contaminants or special test surface;
3 clean room (area) of temperature, relative humidity stability testing;
4 detects the self-cleaning time;
5 detects the clean room (area) tightness test;
6 Determination of illumination;
7 measured noise level;
8 needed to confirm and record airflow patterns and the number of ventilators;
Other test items required for the other 9.
(4) the use of clean plant after acceptance, use and inspection reports should be prepared, and its main contents are:
1 clean room facilities of all kinds (including production technology and equipment) and other open state description;
Description Cleanroom 2 test (region) and their activities; and
3 sub-test record and analyze the comments (including test position, coordinates, etc.);
4 test equipment valid calibration certificate;
5 Acceptance issued by the relevant conclusions.